Home / What insurers look for / Gutters and eaves
Do gutters and eaves matter for insurance?
Updated November 22, 2026
Yes. The Safer from Wildfires and FAIR Plan lists both name enclosed eaves. IBHS Essential requires noncombustible gutters kept clear. IBHS Enhanced adds gutter covers and eaves enclosed with noncombustible material.
The Board of Forestry's Zone 0 rule is not in force yet. Insurers and IBHS already use their own requirements.
What to check
Clear leaves and needles from the gutters before fire season.
Check that the gutters and downspouts are metal or another noncombustible material.
Look up at the eaves. Are they open or enclosed?
Keep plants and branches out from under them.
What each list says
The lists do not always agree. Here is what each one says about this.
- IBHS Essential
Gutters and downspouts are noncombustible and kept clear of debris (section 2.1.2).
- IBHS Enhanced
Gutters are covered with a noncombustible material. Eaves are enclosed (soffited) with noncombustible material such as fiber-cement, stucco or metal, including the fascia boards and outlookers. The December 2025 edition dropped 1-hour fire-rated material and 2-inch lumber as options (sections 3.1.1 and 3.1.2).
- Safer from Wildfires and FAIR Plan
Enclosed eaves.
- State law now
The roof must be kept free of leaves, needles and other plant debris, and no dead wood over the house. Applies now to every building in a State Responsibility Area, in any fire hazard zone, and in Very High fire hazard zones in Local Responsibility Areas.
- Board of Forestry rule (proposed)
Roofs and rain gutters kept clear of leaves, needles and other debris that burns. No plants and no live branches under the eaves.
- San Diego
A voluntary step: noncombustible gutters and downspouts with covers, bird stops in the eave spaces, and boxed or enclosed eaves.
Sources
- IBHS Wildfire Prepared Home Technical Standard (2025 edition)
- Safer from Wildfires regulation: frequently asked questions, California Department of Insurance, September 2026
- Discounts for dwelling fire and commercial policies, California FAIR Plan, November 15, 2025
- Notice of proposed emergency action: Zone 0 defensible space, Board of Forestry, August 20, 2026
- Zone 0 guidelines for existing structures, City of San Diego, April 2026
- Public Resources Code section 4291, via Justia
- 14 CCR 1299.03: defensible space requirements, Board of Forestry, via Justia Regulations
Related questions
- Does my roof matter for insurance?
- What size screen or mesh should go over vents?
- Do I have to replace my siding?
Want the whole picture? Take the free wildfire course.
Corrections
- November 22, 2026. The IBHS Enhanced eave options were out of date. The December 2025 standard requires eaves enclosed with noncombustible material; it no longer accepts 1-hour fire-rated material or 2-inch lumber.